Vendor and OEM commissioning engineers brought to Australia to bring new plant online, or to run site acceptance testing, generally come in on a Subclass 400 Temporary Work (Short Stay Specialist) visa. Commissioning fits the 400 unusually well because the scope, the end point and the specialised skill are all documented by the commissioning plan itself. Resource Visa prepares these applications for Australian projects and OEM service divisions.

What the role covers on Australian sites

Bringing packaged plant, process units and control systems from mechanical completion to handover — pre-commissioning checks, loop testing, functional testing, performance testing and the acceptance procedures that close out a contract. Usually the manufacturer’s own engineers, because the equipment is proprietary and the commissioning procedure is theirs.

What the application has to evidence

The commissioning plan or acceptance test procedure defines the scope and its end point, which is the hardest thing to evidence on most 400 applications and is handed to you here. The OEM relationship establishes why this engineer. The reason it cannot be done locally is usually self-evident: the manufacturer’s trained personnel are where the manufacturer is.

Add what late commissioning costs. Where a handover milestone or liquidated damages attach, quantify them.

Certification and licensing — the clock nobody counts

Generally light, since the qualification is the manufacturer’s. The exception is where commissioning involves energised electrical work or pressure systems, which can attract local licensing requirements that nobody anticipated.

What usually goes wrong

Programmes that run past three months. The most common failure on this role. Large commissioning programmes routinely exceed what the 400 covers, and consecutive applications for the same engineer attract review.

Business visitor confusion. Attending an acceptance test as an observer and performing commissioning work are different activities with different requirements. The line matters and is frequently crossed.

Phase boundaries not defined. Where a programme is phased to fit, the phases need to be real and documented, not a retrospective division of continuous work.

Frequently asked questions

For a defined commissioning or acceptance testing scope of up to three months, generally a Subclass 400.

It depends entirely on what they do. Observing and attending meetings may fall within business visitor activity; performing or directing hands-on commissioning generally does not. Get advice before travel.

Phasing across different engineers by scope, or a Subclass 482 if the engagement is genuinely ongoing. Consecutive 400s for one engineer is not a reliable approach.

Yes — preferred-supplier arrangements with one nominated contact, batch processing against a project calendar, and a standing business-case template.